450㎡ resin flooring at a new refrigerator hire warehouse in Bolnhurst, Bedfordshire.

Floor preparation

We carried out extensive floor preparation using our diamond grinding equipment, ready for priming and the high-build topcoat. See previous project.

Expansion gaps

We re-cut the expansion gaps, taped them and filled with high performance PU sealer.

  • Client : Refrigerator hire warehouse
  • Location : Bedfordshire
  • Date : 2025

Top coat

After priming we installed the high-build epoxy resin topcoat.

Epoxy resin coatings offer a durable and attractive finish for a wide range of applications.

Our work